{"id":278,"date":"2020-10-09T11:23:25","date_gmt":"2020-10-09T14:23:25","guid":{"rendered":"http:\/\/www.addesys.com\/?page_id=278"},"modified":"2021-05-04T14:56:55","modified_gmt":"2021-05-04T17:56:55","slug":"proyecto-ingenieria-electrica","status":"publish","type":"page","link":"https:\/\/www.addesys.com\/en\/proyecto-ingenieria-electrica\/","title":{"rendered":"Electrical Engineering"},"content":{"rendered":"\n<section class=\"padtb50\">\n<div class=\"container\">\n<div class=\"row\">\n<div class=\"col-md-12\">\n<p class=\"txtserviciospag\">Uniting our experiences obtained in different branches of industry, such as metallurgy, energy, pharmaceutical, and construction; We make up an interdisciplinary team capable of projecting innovative and economically sustainable solutions to the different and changing needs of our clients.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n\n\n\n<div class=\"container\">\n<div class=\"col-md-12\">\n<img decoding=\"async\" class=\"img-fluid mx-auto d-block titproy\" src=\"\/wp-content\/uploads\/2021\/05\/Electrical-Engineering.jpg\"> \n<\/div>\n<\/div>\n\n\n\n<section class=\"filadeproyecto\">\n<div class=\"container\">\n<div class=\"row align-items-center filaintproyectossubti\">\n<div class=\"col-md-3\">\n<img decoding=\"async\" src=\"\/wp-content\/uploads\/2020\/10\/anteproyecto.png\" class=\"img-fluid mx-auto d-block icoproy\">\n<\/div>\n<div class=\"col-md-9\">\n<p class=\"titpryectoint\">Preliminary Project<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\">\n<p class=\"txtserviciospag textojustificado\">Any initiative must begin with the study of the feasibility and the cost-benefit ratio.<\/p>\n<p class=\"txtserviciospag textojustificado\">That is why for any investment that contains some facet of an electrical nature \u2500generation, distribution, process control, buildings\u2500 we take care of the basic engineering, including:<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-6 colproyectoint\">\n<p class=\"txtserviciospag\">\u2022 Estimation of electrical charges.<\/p>\n<p class=\"txtserviciospag\">\u2022 Study of the maximum simultaneous demand.<\/p>\n<p class=\"txtserviciospag\">\u2022 Pre-sizing of the supply and its protections.<\/p>\n<\/div>\n<div class=\"col-md-6 colproyectoint\">\n<p class=\"txtserviciospag\">\u2022 Power single-line diagrams.<\/p>\n<p class=\"txtserviciospag\">\u2022 Diagrams of wiring and conduit layouts.<\/p>\n<p class=\"txtserviciospag\">\u2022 Projections of maintenance cost and energy billing amounts.<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\">\n<p class=\"txtserviciospag\">Data which is essential when making any decision.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n\n\n\n<section class=\"filadeproyecto\">\n<div class=\"container\">\n<div class=\"row align-items-center filaintproyectossubti\">\n<div class=\"col-md-3\">\n<img decoding=\"async\" src=\"\/wp-content\/uploads\/2020\/10\/proyectoejecutivo.png\" class=\"img-fluid mx-auto d-block icoproy\">\n<\/div>\n<div class=\"col-md-9\">\n<p class=\"titpryectoint\">Detail Project<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\">\n<p class=\"txtserviciospag textojustificado\">Carrying out an electrical and\/or industrial automation work in an orderly, efficient and safe way is impossible without prior preparation of a project that includes all its details and the interaction between them.<\/p>\n<p class=\"txtserviciospag textojustificado\">\nOur commitment is to design all the component elements of an installation in the most optimal way possible, contemplating:<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-6 colproyectoint\">\n<p class=\"txtserviciospag\">\u2022 Power, command and signals multi-line drawings.<\/p>\n<p class=\"txtserviciospag\">\u2022 Cabling and conduit calculations.<\/p>\n<p class=\"txtserviciospag\">\u2022 Selection, coordination and adjustment of electrical protections.<\/p>\n<\/div>\n<div class=\"col-md-6 colproyectoint\">\n<p class=\"txtserviciospag\">\u2022 Selection, sizing and connection of sensors and actuators.<\/p>\n<p class=\"txtserviciospag\">\u2022 Design of safety systems and emergency stops.<\/p>\n<p class=\"txtserviciospag\">\u2022 Design of board panels and enclosures for control and power distribution.<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\">\n<p class=\"txtserviciospag mt15\">With a voltage level range of up to 132 kV.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n\n\n\n<section class=\"filadeproyecto\">\n<div class=\"container\">\n<div class=\"row align-items-center filaintproyectossubti\">\n<div class=\"col-md-3\">\n<img decoding=\"async\" src=\"\/wp-content\/uploads\/2020\/10\/documentacion.png\" class=\"img-fluid mx-auto d-block icoproy icodocum\">\n<\/div>\n<div class=\"col-md-9\">\n<p class=\"titpryectoint\">Documentation<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\">\n<p class=\"txtserviciospag textojustificado\">With thousands of flight hours in the use of CAD tools, we are happy to say that we are capable of preparing all the documentation of an engineering project according to international standards such as IEC and NFPA. In each case supplying:<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-6 colproyectoint\">\n<p class=\"txtserviciospag\">\u2022 Power, command and signals multi-line drawings.<\/p>\n<p class=\"txtserviciospag\">\u2022 Signal lists.<\/p>\n<p class=\"txtserviciospag\">\u2022 Terminal lists.<\/p>\n<p class=\"txtserviciospag\">\u2022 Wire and cable labeling books.<\/p>\n<\/div>\n<div class=\"col-md-6 colproyectoint\">\n<p class=\"txtserviciospag\">\u2022 Physical drawings of board panels and junction boxes.<\/p>\n<p class=\"txtserviciospag\">\u2022 Plant distribution plans and details of field assemblies.<\/p>\n<p class=\"txtserviciospag\">\u2022 Bill of materials and quotes.<\/p>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\">\n<p class=\"txtserviciospag mt15\">All this in digital and printed format for better traceability and maintenance.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n\n\n\n<section class=\"filadeproyecto\">\n<div class=\"container\">\n<div class=\"row\">\n<div class=\"col-md-4\">\n<img decoding=\"async\" class=\"img-fluid mx-auto d-block logodocume\" src=\"\/wp-content\/uploads\/2020\/10\/autocad_electrical_logo.png\">\n<\/div>\n<div class=\"col-md-4\">\n<img decoding=\"async\" class=\"img-fluid mx-auto d-block logodocume\" src=\"\/wp-content\/uploads\/2020\/10\/eplan.png\">\n<\/div>\n<div class=\"col-md-4\">\n<img decoding=\"async\" class=\"img-fluid mx-auto d-block logodocume\" src=\"\/wp-content\/uploads\/2020\/10\/solidworks.png\">\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Uniting our experiences obtained in different branches of industry, such as metallurgy, energy, pharmaceutical, and construction; We make up an interdisciplinary team capable of projecting innovative and economically sustainable solutions to the different and changing needs of our clients. Preliminary Project Any initiative must begin with the study of the feasibility and the cost-benefit ratio.&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.addesys.com\/en\/wp-json\/wp\/v2\/pages\/278"}],"collection":[{"href":"https:\/\/www.addesys.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.addesys.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.addesys.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.addesys.com\/en\/wp-json\/wp\/v2\/comments?post=278"}],"version-history":[{"count":12,"href":"https:\/\/www.addesys.com\/en\/wp-json\/wp\/v2\/pages\/278\/revisions"}],"predecessor-version":[{"id":528,"href":"https:\/\/www.addesys.com\/en\/wp-json\/wp\/v2\/pages\/278\/revisions\/528"}],"wp:attachment":[{"href":"https:\/\/www.addesys.com\/en\/wp-json\/wp\/v2\/media?parent=278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}